13.10.2016

“Caspian Energy” Group completed construction and commissioning of LSP-1 Riser Block


Specialists of the “Caspian Energy” Group (included in USC) have fully completed a range of construction and installation activities on Riser Block -1 and Walkway Bridge-3.

On May 7th 2016 a group of company specialists was sent to V._Filanovsky field for the task prompt performance and management.

According to the contractual list of activities the Riser Block steelwork was painted, pipeline systems were insulated together with pipes and valves, cable was purchased, laid and fixed, including flare ignition systems.

Commissioning included a range of required activities and acceptance tests related to all systems and equipment of RB-1: vessel and power unit, operational and process unit, automation and control networks.